I spent the third week of the CH-46A/D working on the port wall. I am using 30 gauge wire for the cables, 28 gauge bare wire for all the hard lines, and 38 gauge bare wire for the smaller wires. The first thing I did was amount the port side cargo light. For all the lighting I will be running the wires up to the spine. They will then run in-between the forward bulkheads to the bottom side of the fuselage. Ultimately the two power wires will run thru the landing gear to the underside of the display base.
I continued adding details using the reference photos. All of the cables ties were painted on and I also detailed painted some of the equipment. With all the details added I then applied the custom identification plates on to the few avionics and the kit decals to the wall. I then test fitted the wall into the fuselage. One modification I needed to do was to make is for the port side formation light. This is going to be made with a 0.75mm fiber optic line and illuminated with a small light box housing a pico sized LED. I drilled a hole thru the wall and the outer fuselage. (see red arrow on last photo) I will need to wait until I install the wall before adding the light box. This is because the fiber optic line will need to be trimmed from the inside and then the light box will need to be aligned correctly over fiber optic.
I am now working on the starboard side wall. Once this is done I will be detailing the interior roof and then onto the cockpit which will feature an illuminated instrument panel. I need to see how the lighting will affect the order of assembly. I will need to run the wiring from the tail and the belly lighting before closing up the fuselage.
You can see this build from the start in the build log at: https://davidsscalemodels.com/build-log/1-48-ch-46a-d-helicopter/
[ATTACH=full]114516[/ATTACH]
[ATTACH=full]114517[/ATTACH]
[ATTACH=full]114518[/ATTACH]
[ATTACH=full]114519[/ATTACH]
[ATTACH=full]114520[/ATTACH]
[ATTACH=full]114521[/ATTACH]