More work today on the Mizzen Decks.
The Officers Quarters has now been installed along with the Aft Artillery Control Rm., HA Rangefinder Deck and the Signals Platform. The railings around the 2 aft AA positions on the 1st Mizzen Deck have also now been installed.
An Aft on view of the ship.
There is a 7.5m Rangefinder to build that installs onto the Aft Artillery Control Rm. and 2 HA Rangefinder units, before we can start some more small details ( AA guns and Searchlights etc.).
This is where I am at tonight.
Thank you for following
Questions and comments welcome.
Thank you Todd.
She's moving along faster than I thought it would. At first I thought it may be too ambitious a build for the contest.
Am happy myself with the progress.
It really wasn't that hard to build. Just the waiting for glue to dry between stages, is what takes time.
I did one mod., the back of the light was too flat, so using a 2mm embossing tool, gave the back panel, the more rounded shape I would expect, with these.