Good day all.
Time for an update.
Started working on the components of the main deck. Installed the anchor chains for the main and Aft anchors, then assembled the Capstans, two for the aft section and 2 for the main anchors. The forward capstans consist of 6 pieces each, where the two aft units 4 pieces. Cutting and shaping pieces at the size of the aft capstans can be interesting. Have to work with pins, as even toothpicks are too big. ;D
Here is the work for the 2 Aft Capstans.
The 2 Aft Capstans in place.
The Forward Capstans for the main Anchors were assembled and installed, as were the main Anchors. The placement of the anchors given with the kit were wrong, according to images and drawing of the ship that I have and were corrected. Also missing from the kit were the two "Bow Anchor Hawse", which are 2 chain guides for the anchor and chain. These were easy enough to synthesize from the ships drawings.
And the last to install was the Stern Anchor. I have images of this anchor hanging Port, Starboard and straight. I elected straight because this anchor lays tighter to the hull at this orientation.
Some of these small parts take time to assemble. So some updates may be slow.
Thank you for following.
Questions and comments are welcome.
Jim