Good evening.
I did get that 2nd deck installed on the forecastle, but had to do some modification.
When it was test fitted, it just wanted to fold in, in the centre. There is no centre support for this deck, so I had to add some ribs of double thick card to keep it flat.
It was simple and worked quite fine.
Added also were the lean rail to the forecastle bridge and the 2 side observation bridges. The mid breakwater and the protective wall around the 2 forward AA positions, have also been added.
So this is where I am at tonight.
Thank you for following.
Questions and comments welcome.
For tonight's update, the 3rd level of the forecastle has been added ( the bridge). The upper deck decking, I had the same problem as before, and had to add support for the deck.
Since the next level has an overhang near the rear of this deck. Before it can be installed, 2 optical range finders have to be installed first. I have started work on assembling these.
For those old enough to remember this.
https://youtu.be/M1Ufc2hI4FM
Thank you for following.
Questions and comments welcome.