Papermodder
Modeller in both Plastic and Paper Card
- Joined
- Jan 2, 2013
- Messages
- 1,224
Still have a few minor details to clean up, but this Patlbor project is pretty much done.
This morning mounted Alphonse into the Maintenance Station, making sure to leave enough clearance for the cables and that the Labor clears the gantry.
This afternoon the cables were attached to the service boom. This evening I built a hanger on the left side of the Maintenance Station, to hang the extra cables. I'll let this dry overnight before hanging those cables.
So here are a couple of teaser shots of the assembly. A proper photo shoot will follow later.
Thank you for following.
Jim
This morning mounted Alphonse into the Maintenance Station, making sure to leave enough clearance for the cables and that the Labor clears the gantry.
This afternoon the cables were attached to the service boom. This evening I built a hanger on the left side of the Maintenance Station, to hang the extra cables. I'll let this dry overnight before hanging those cables.
So here are a couple of teaser shots of the assembly. A proper photo shoot will follow later.
Thank you for following.
Jim